MURGATROYD'S BRINE PUMPS - The last of their kind

Phase 1 of the project to save Murgatroyd's Brine Pumps is now complete after seven years of work by the Town's Heritage Officer and George Twigg, formerly Chief Chemist at Murgatroyd's - thanks to Historic England with contributions from Cheshire East Council and Middlewich Town Council. Hopefully, phase 2 (work on the shaft and minor repairs) will follow in the coming year. We are not quite at the stage of getting volunteers working on site but we will be opening the site for visitors later this year


If there are any of you out there who are interested in volunteering your time in the coming year we'd love to hear from you  

middlewich.heritage.trust@gmail.com

Friday, 11 March 2016

MURGATROYD'S BRINE PUMPS - The last of their kind

The internal scaffold has been removed and brick supports have been installed for the gantry legs as a temporary support until more funding can be provided. The gantry still needs work around the footings which will form part of the internal structure around the well-head.

With only minor jobs to finish, the external scaffold will soon come down. The roof is now water-tight and the gantry has had some metal straps and plates fixed. So all looks in great shape - a distinct improvement over the state of the monument before work started..


If there are any of you out there who are interested in volunteering your time next year we'd love to hear from you  middlewich.heritage.trust@gmail.com

Friday, 19 February 2016

MURGATROYD'S BRINE PUMPS - The last of their kind

The roof and temporary flashings are now in place and the building is finally water-tight. Years of water damage have taken their toll on the structures but considerable progress has now been made to safeguard this monument for the future.

The internal scaffold will be removed by the beginning of next week and work can then begin within the building to stabilise the gantry. Gantry works are expected to continue for another week. Additional steelwork has been applied to the external gantry and this will continue inside the building. All pipework has been stabilised and secured.

When the Phase 1 work has been signed off, the scaffold will be removed and, during week beginning 7 March, the site will be fully inspected before being cleared and secured as the first phase of emergency works is completed. The building will then be temporarily sealed until phase 2 work can begin.

The structure above ground is now secured and stabilised and the Trust is delighted with the progress so far. However, the building will remain on the 'at risk register' until the completion of the second phase of repair works 


 If you would like to be involved with this project, please email middlewich.heritage.trust@gmail.com


Thursday, 28 January 2016

MURGATROYD'S BRINE PUMPS - The last of their kind

Arrangements for the transfer of the pump site to the Trust have been agreed by Cheshire East Council based on the pump's place in the Town's heritage scheme and the Neighbourhood plan.

The emergency repairs project is almost at an end.

The monument had considerable deterioration and decisions had to made on the vulnerable areas by our Project Manager and his team. There is still work to do and we will be applying for more funding to resolve the remaining issues.

The joinery work is almost finished, timbers have been replaced where necessary or repaired; new frames for the windows and doors have been fitted and a new frame support for the side of the building. The roof plates and trusses have been finished and the brickwork repairs completed.

The corrugated metal roof has been measured up and will be fitted next week.

The water tank could not be saved and it is in the process of being dismantled, the remaining asbestos underneath the tank will be removed and the area covered.

The external pumps have been covered by a timber frame and protected from further damage.

News on the gantry will follow. 

If you would like to be involved with this project, please email middlewich.heritage.trust@gmail.com

Wednesday, 16 December 2015

MURGATROYD'S BRINE PUMPS - The last of their kind

Despite the recent poor weather, work has continued on the building.

Old boarding has been removed as has the asbestos sheeting apart from that under the tank which needs to be done separately. The windows and doors have all been uncovered and another doorway, which will be preserved, has been uncovered. The original frames are being retained so far as possible and new framework to receive the doors and windows will be inserted where necessary. Boarding has been reinstated until the final installation of doors and windows is carried out. The main priority is keeping everything watertight, dealing with the purlins, and renovating the gable ends and wall plates where required.

A work programme for replacing some timbers and steel work on the gantry has been issued. The work that is needed to renovate the water tank has been priced and agreed and will start in the new year. 


If there are any of you out there who are interested in volunteering your time next year we'd love to hear from you  middlewich.heritage.trust@gmail.com

Tuesday, 8 December 2015

MURGATROYD'S BRINE PUMPS - The last of their kind


As the weeks roll on at the Murgatroyd's Brine Pumps site, despite the high winds the monument is still upright! Asbestos has been removed and a temporary roof has been put in place to shield the pumps from the weather pending a further engineer's report on how to proceed with the gantry and water tank.

A new conservation officer covering Middlewich, Katherine Bailey, visited the site this week for the first time. We welcome Katherine to our group, and with her experience from Staffordshire of the coal industry, it will be great to get a wider point of view on our project.

There is some extra support and offers of volunteer help coming through now, so we are thinking of having a volunteers' afternoon at some point during January – March. The date is dependent upon the weather for a site visit and the point reached  in the programme for the project.

If there are any of you out there who arte interested in volunteering your time next year we'd love to hear from you  middlewich.heritage.trust@gmail.com

Wednesday, 25 November 2015

MURGATROYD'S BRINE PUMPS - The last of their kind

The scaffold is up inside and outside the building and the asbestos is largely disposed of. So the first stages of the scheme are complete and, for the first time since the 1970’s, we take our first look at the gantry and the top of the water tank.

The close inspection results in a mixture of awe and trepidation!

The Brine Pumps site is in worse condition than anticipated. It looks as though the emergency repairs, supported by Historic England, are happening just in time to save the site. Another year and we could have lost the last intact brine pumps site in the UK. The project will be more complicated than anticipated but the rewards of saving the site outweigh the amount of work involved.

The Engineers report points out that

“The timbers and steel to parts of the gantry and quite badly decayed with imminent failure likely of some timbers”

“We were originally intending to protect the tank to prevent further decay but in reality there is not much left to protect and some components need to be dismantled for safety”.


Losing the water tank is disappointing, but the metal has corroded up to 20mm in places, so it is already too late to save it. However the components can be used as a template to make a new tank as part of a revised project.

The priority now is to stabilise the gantry and the engineers are putting plans in place to repair the wooden elements where possible, working from the top down and cutting and replacing some of the metal work.

This project is being carried by the project's contractors Bullen Conservation, Appleyard and Trew, Ramboll, and with project management from Buttress who have done a fantastic job so far with such a challenging site.